So by its present design, the AC300 cannot manage more than two B300 per port for a maximum of 12 kWh. Can it be upgraded by OTA software fixes in the future to handle more batteries? How about building larger batteries, such as a B500 (5kWh) so the AC300 can manage 20 kWh each?
Our AC300 can only manage two B300 per port, and its capacity can be expanded about 12 kWh. Iām not sure whether it can be upgraded to handle more batteries or not. But we will mainly focus on larger batteries in the future.
My two B300s arrived but there is no T500 in the boxes, yet there is an empty box where it may arrive in the top packing. Was the T500 eliminated for the newer versions (Jan 22 and later)?
As far as I know the T500 has always been a extra cost option with the B300ās.