I intend to use two AC500’s each with two B300S batteries. They will be setup to run in Split Phase 240 operation delivering 240v/ 50amp power to a Reliance Pro/Tran2 510c sub-panel. Each AC500 will have 8 rigid panels connected for 3000W input, and each B300S battery will have its own 405W panel connected directly to the battery. This will allow a theoretical 7620W solar input. I plan to run in PV Priority mode and charge / pass-through via Bluetti 50amp Split Phase charging cable.
I plan for this to be a 24/7 configuration. The 510C Sub Panel will provide well pump, water heater, air handler, compressor, refrigerator, freezer, lights.
Is anyone running with this or a similar setup? Any pitfalls to lookout for?